B. CZARNECKI. The idea of increasing the NPS operational flexibility by reallocating the secondary reserve band to wind power plants. Acta Energetica, [S. l.], n. 03, p. 49–53, 2017. DOI: 10.52710/ae.189. Disponível em: https://actaenergetica.org/index.php/journal/article/view/189. Acesso em: 3 jul. 2024.